1/00 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) |
1/02 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work |
1/04 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work Sampling of soil |
1/06 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) before construction work Sampling of ground water |
1/08 | Investigation of foundation soil in situ (investigation involving boring or specially adapted to earth drilling E21B 25/00, E21B 49/00; investigating or analysing materials by determining their chemical or physical properties, in general G01N, e.g. sampling G01N 1/00) after finishing the foundation structure |
3/00 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) |
3/02 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) |
3/026 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) |
3/032 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) Trench rollers |
3/039 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by rolling with rollers usable only for or specially adapted for soil compaction, e.g. sheepsfoot rollers (rollers for soil working in agriculture A01B 29/00; rollers for road paving, such rollers usable also for compacting soil E01C 19/23) Slope rollers |
3/046 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) |
3/054 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) involving penetration of the soil, e.g. vibroflotation |
3/061 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Tampers with directly acting explosion chambers (pile drivers with explosion chambers E02D 7/12) |
3/068 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Vibrating apparatus operating with systems involving reciprocating masses (E02D 3/054, E02D 3/061 take precedence) |
3/074 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by tamping or vibrating, e.g. with auxiliary watering of the soil (E02D 3/026, E02D 3/08 take precedence; tamping or vibrating apparatus for working ballast on railways E01B 27/00, for consolidating paving materials E01C 19/3, for consolidating concrete in general E04G 21/06) Vibrating apparatus operating with systems involving rotary unbalanced masses (E02D 3/054 takes precedence) |
3/08 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by inserting stones or lost bodies, e.g. compaction piles (sand drains for soil compaction E02D 3/1; stressing soil while forming foundations E02D 27/28) |
3/10 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Improving by compacting (E02D 3/11 takes precedence; compacting soil locally before or while forming foundations E02D 27/26, E02D 27/28) by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains (E02D 3/11 takes precedence; soil-penetrating vibrators with auxiliary watering E02D 3/054; drainage of soil in general E02B 11/00) |
3/11 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14) |
3/115 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) by thermal, electrical or electro-chemical means (freezing soil for interrupting passage of underground water E02D 19/14) by freezing |
3/12 | Improving or preserving soil or rock, e.g. preserving permafrost soil (securing of slopes or inclines E02D 17/2; damming or interrupting passage of underground water E02D 19/12; improving soil for agricultural purposes A01; soil stabilisation for road building or like purposes E01C 21/00, E01C 23/1; setting rock anchoring bolts E21D) Consolidating by placing solidifying or pore-filling substances in the soil (making piles E02D 5/46; soil-conditioning or soil-stabilising materials C09K 17/00) |