2025/0012,214 | SYSTEM AND METHOD FOR HIGH EFFICIENCY POWER GENERATION USING A CARBON DIOXIDE CIRCULATING WORKING FLUID | Sep 24, 24 | Jan 09, 25 | Not available |
2022/0412,557 | SYSTEM AND METHOD FOR COMBUSTION OF NON-GASEOUS FUELS AND DERIVATIVES THEREOF | Aug 17, 22 | Dec 29, 22 | Not available |
2022/0381,434 | APPARATUS AND METHOD FOR MITIGATING PARTICULATE ACCUMULATION ON A COMPONENT OF A GAS TURBINE | Aug 05, 22 | Dec 01, 22 | Not available |
2022/0373,178 | COMBUSTION CHAMBER AND GAS APPARATUS | Oct 23, 20 | Nov 24, 22 | Not available |
2022/0333,773 | Combustion Apparatus | Mar 24, 22 | Oct 20, 22 | Rinnai Corporation |
2021/0325,035 | High pressure heating installation comprising an advanced panel design and cladding thereof | Jul 29, 19 | Oct 21, 21 | Amsterdam Waste Environmental Consultancy & Technology B.V. |
2021/0116,126 | SYSTEM AND METHOD FOR COMBUSTION OF NON-GASEOUS FUELS AND DERIVATIVES THEREOF | Nov 02, 20 | Apr 22, 21 | Not available |
2020/0326,069 | LINER COOLING STRUCTURE WITH REDUCED PRESSURE LOSSES AND GAS TURBINE COMBUSTOR HAVING SAME | Mar 13, 20 | Oct 15, 20 | Not available |
2020/0263,607 | BACKSIDE FEATURES WITH INTERMITTED PIN FINS | Mar 11, 20 | Aug 20, 20 | Not available |
2020/0200,047 | WASTE-TO-ENERGY PLANT | Jun 23, 17 | Jun 25, 20 | Not available |
2020/0141,576 | TURBULATOR GEOMETRY FOR A COMBUSTION LINER | Nov 02, 18 | May 07, 20 | Not available |
2020/0109,854 | DILUTION/EFFUSION HOLE PATTERN FOR THICK COMBUSTOR PANELS | Oct 03, 18 | Apr 09, 20 | United Technologies Corporation |
2020/0063,959 | SYSTEM WITH CONDUIT ARRANGEMENT FOR DUAL UTILIZATION OF COOLING FLUID IN A COMBUSTOR SECTION OF A GAS TURBINE ENGINE | Mar 22, 18 | Feb 27, 20 | Not available |
2019/0195,495 | APPARATUS AND METHOD FOR MITIGATING PARTICULATE ACCUMULATION ON A COMPONENT OF A GAS TURBINE | Dec 20, 18 | Jun 27, 19 | Not available |
2019/0195,496 | APPARATUS AND METHOD FOR MITIGATING PARTICULATE ACCUMULATION ON A COMPONENT OF A GAS TURBINE | Dec 20, 18 | Jun 27, 19 | Not available |
2019/0186,358 | FURNACE WALL, GASIFICATION UNIT AND INTEGRATED GASIFICATION COMBINED CYCLE, AND METHOD OF MANUFACTURING FURNACE WALL | Oct 11, 17 | Jun 20, 19 | MITSUBISHI HITACHI POWER SYSTEMS, LTD. |
2019/0186,739 | APPARATUS AND METHOD FOR MITIGATING PARTICULATE ACCUMULATION ON A COMPONENT OF A GAS TURBINE ENGINE | Dec 05, 18 | Jun 20, 19 | Not available |
2019/0145,623 | GAS TURBINE ENGINE COOLING STRUCTURE AND METHOD FOR MANUFACTURING SAME | Jan 15, 19 | May 16, 19 | Kawasaki Jukogyo Kabushiki Kaisha |
2019/0101,287 | COOLING STRUCTURE FOR GAS TURBINE ENGINE | Nov 30, 18 | Apr 04, 19 | Kawasaki Jukogyo Kabushiki Kaisha |
2019/0071,985 | AIR-COLLECTING STRUCTURE FOR ENHANCING COOLING PERFORMANCE FOR TRANSITION PIECE AND GAS TURBINE COMBUSTOR HAVING SAME | Jul 02, 18 | Mar 07, 19 | Not available |