F01K 3/06

Technology



back to "F01K 3/06" profile

More Results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2025/0116,211 PUMPED HEAT ENERGY STORAGE SYSTEM INTEGRATED WITH COAL-FIRED ENERGY GENERATION UNITDec 14, 22Apr 10, 25Not available
2025/0101,886 LONG-DURATION PHES SYSTEMS WITH MODULAR CONFIGURATIONSJan 10, 23Mar 27, 25Not available
2025/0084,773 DUAL-POWERTRAIN PUMPED HEAT ENERGY STORAGE WITH INVENTORY CONTROL AND PURGENov 21, 24Mar 13, 25Not available
2025/0012,207 POWER GENERATION FACILITYSep 20, 24Jan 09, 25KABUSHIKI KAISHA TOSHIBA; Toshiba Energy Systems & Solutions Corporation;
2024/0337,220 VARIABLE PRESSURE INVENTORY CONTROL OF CLOSED CYCLE SYSTEM WITH A HIGH PRESSURE TANK AND AN INTERMEDIATE PRESSURE TANKJun 14, 24Oct 10, 24Not available
2024/0159,168 DUAL-POWERTRAIN PUMPED HEAT ENERGY STORAGE WITH INVENTORY CONTROL AND PURGEDec 21, 23May 16, 24Not available
2024/0117,759 POWER GENERATION FACILITYJul 19, 23Apr 11, 24KABUSHIKI KAISHA TOSHIBA; Toshiba Energy Systems & Solutions Corporation;
2022/0349,355 VARIABLE PRESSURE INVENTORY CONTROL OF CLOSED CYCLE SYSTEM WITH A HIGH PRESSURE TANK AND AN INTERMEDIATE PRESSURE TANKJun 27, 22Nov 03, 22Not available
2019/0162,122 Use of External Air for Closed Cycle Inventory ControlJan 29, 19May 30, 19Not available
2015/0059,342 SYSTEM FOR STORING AND OUTPUTTING THERMAL ENERGY AND METHOD FOR OPERATING SAID SYSTEMMar 28, 13Mar 05, 15SIEMENS AKTIENGESELLSCHAFT