E21D

Technology



back to "E21D" profile

More Results

Showing 1 to 20 of 1426 results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2025/0116,192 ASYMMETRIC HYDRAULIC SUPPORTS FOR PSEUDO INCLINED MINING IN STEEPLY DIPPING SEAMOct 08, 24Apr 10, 25XI'AN UNIVERSITY OF SCIENCE AND TECHNOLOGY
2025/0109,689 ROTARY DIGGING DRILL AND AMPHIBIOUS TUNNEL CONSTRUCTION ROBOT USING SAMEApr 19, 23Apr 03, 25Not available
2025/0101,868 VISUALIZATION GROUTING DEVICE FOR COAL AND ROCK FISSURES AND TEST METHODOct 24, 24Mar 27, 25Not available
2025/0101,869 SUPPORT PROPSep 16, 24Mar 27, 25Not available
2025/0102,701 METHOD AND DEVICE FOR IDENTIFYING FULL-SECTION EXCAVATION PARAMETERS OF LARGE-SECTION TUNNEL WITH BROKEN SURROUNDING ROCKOct 11, 24Mar 27, 25Not available
2025/0093,141 SHOTCRETE GAUGEOct 04, 23Mar 20, 25Not available
2025/0095,177 METHOD AND SYSTEM FOR AUTOMATICALLY COLLECTING MULTIPLE INFORMATION OF TUNNEL DURING CONSTRUCTION PERIODNov 22, 24Mar 20, 25Not available
2025/0092,787 ROCK BOLTSep 18, 24Mar 20, 25Not available
2025/0092,786 GROOVE-TYPE SKELETON, SEALED LINING STRUCTURE, UNDERGROUND GAS STORAGE AND CONSTRUCTION METHODJun 07, 24Mar 20, 25Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
2025/0067,176 Systems And Methods For Non-Contact BoringNov 08, 24Feb 27, 25Not available
2025/0067,177 CONTROL APPARATUS AND METHOD FOR BUOYANCY ADJUSTMENT OF SHIELD TUNNEL SEGMENTSOct 29, 24Feb 27, 25Not available
2025/0067,178 BULK RESIN INJECTION SYSTEMAug 23, 24Feb 27, 25Not available
2025/0059,890 GROUT PLUG WITH GASKET FOR POCKET FORMERAug 15, 23Feb 20, 25Not available
2025/0034,996 AUTOMATIC SUPPORT DEVICE FOR RESISTING ROCK BURST IN MINESAug 29, 24Jan 30, 25Not available
2025/0034,997 INJECTION DRIVER ASSEMBLY FOR HOLLOW BAR BOLT INSTALLATIONJul 25, 23Jan 30, 25Not available
2025/0034,998 ROCK BOLTOct 27, 22Jan 30, 25Not available
2025/0027,413 Dual-Power Hydraulic Roof BolterMay 30, 22Jan 23, 25Not available
2025/0012,189 ANTI-CORROSION MATERIAL AND ANTI-CORROSION METHOD FOR SUBMERGED FLOATING TUNNEL PIPE SECTION CONCRETEAug 29, 22Jan 09, 25CCCC SHANGHAI THIRD HARBOUR ENGINEERING SCIENCE & TECHNOLOGY RESEARCH INSTITUTE CO., LTD.; CCCC THIRD HARBOR ENGINEERING CO., LTD.;
2025/0003,337 VENTILATION METHOD FOR HIGH GAS WORKING FACE BASED ON ALTERNATING INTAKE AND AIR RETURN IN MINE GALLERYSep 13, 24Jan 02, 25Not available
2024/0411,047 METHOD FOR EVALUATING STABILITY OF TUNNEL SURROUNDING ROCK CONSIDERING CREEP CHARACTERISTICS OF STRUCTURAL PLANEMar 19, 24Dec 12, 24Not available

Showing 1 to 20 of 1426 results