E04B 1/18

Technology



back to "E04B 1/18" profile

More Results

Showing 1 to 20 of 185 results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2025/0012,072 BEAM OR POST FOR A CONSTRUCTION SYSTEMOct 11, 22Jan 09, 25Not available
2024/0392,555 Elevating Platform DeviceJun 12, 23Nov 28, 24Not available
2024/0191,508 MODULAR CONSTRUCTION CONNECTION MECHANISMFeb 23, 24Jun 13, 24Not available
2024/0011,276 MODULAR BUILDING STRUCTUREJul 08, 22Jan 11, 24A&C Future Inc
2024/0011,279 Modular Collapsible Building FramesJul 06, 22Jan 11, 24Not available
2023/0383,519 CONNECTING HARDWARE AND STRUCTURE SYSTEMMay 26, 23Nov 30, 23Not available
2023/0078,431 BUILDING SYSTEMJan 28, 21Mar 16, 23DVLP International Ltd
2023/0042,380 SYSTEM FOR TRANSMITTING A FLEXURAL WAVE FROM ONE STRUCTURE TO ANOTHER BY IMPEDANCE MATCHINGAug 09, 21Feb 09, 23Not available
2022/0349,195 DE-CONSTRUCTIBLE SMALL INHABITABLE ENCLOSURENov 25, 19Nov 03, 22Not available
2022/0243,457 HORIZONTALLY AND VERTICALLY EXTENDABLE BUILDING STRUCTURE MODULEMay 14, 20Aug 04, 22TAYYAR & O'CONNOR INC.
2022/0228,358 Interior Construction Structures and SystemsJan 19, 22Jul 21, 22Not available
2022/0205,233 ISO-TRUSS STRUCTURE AND COUPLING MECHANISM FOR ISO-TRUSS STRUCTURESep 28, 21Jun 30, 22Not available
2022/0025,635 Modular Framing SystemJul 23, 21Jan 27, 22Not available
2021/0340,751 GROUND ANCHOR BRACKET WITH SIMULATED SLAB SUPPORT FOR CONCRETE WALL BRACESJul 16, 21Nov 04, 21Not available
2021/0340,750 Concrete-Filled Steel Tubular Column-Steel Plate Concrete Ring Beam Joint and Construction Method ThereofMay 22, 18Nov 04, 21Not available
2021/0040,722 LIGHT WEIGHT CONSTRUCTION SYSTEM BASED ON HORIZONTALLY PRE-SLOTTED PANELSMar 19, 20Feb 11, 21Not available
2020/0362,550 METHOD AND STRUCTURE FOR INCREASING USABLE SPACE IN A PARKING LOTAug 03, 20Nov 19, 20Not available
2020/0340,231 Techniques to Assemble, Design, Fabricate, Install, Specify, and Use Structures Combining Different Member Types for Building Construction Framing and Comparable ApplicationsApr 25, 19Oct 29, 20Not available
2019/0308,341 KIT FOR CONSTRUCTING A STACKABLE COLUMNApr 04, 19Oct 10, 19Not available
2019/0301,152 GROUND ANCHOR BRACKET WITH SIMULATED SLAB SUPPORT FOR CONCRETE WALL BRACESMar 26, 19Oct 03, 19Not available

Showing 1 to 20 of 185 results