E02D 3/12

Technology



back to "E02D 3/12" profile

More Results

Showing 1 to 20 of 215 results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2025/0092,625 HEAT COLLECTION BAG, DEVICE AND METHOD FOR SOLIDIFYING AND FILLING CALCIUM SAND FOUNDATIONDec 12, 23Mar 20, 25INSTITUTE OF ROCK AND SOIL MECHANICS, CHINESE ACADEMY OF SCIENCES
2025/0092,626 COMPOSITION, METHOD AND SYSTEM FOR STABILISING A ROCK MASSMar 02, 23Mar 20, 25Not available
2025/0084,311 HYDROGEL COMPOSITIONS FOR STABILIZATION OF SOILSSep 05, 24Mar 13, 25Not available
2025/0075,457 Systems and Methods For Erosion ControlJun 06, 24Mar 06, 25ShoreLock, LLC
2025/0027,289 SELF-LEARNING FRAMEWORK FOR PREDICTIVE TOPOGRAPHIC MODELING AND INTELLIGENT REAL-TIME SYSTEM CONTROL OF SUBTERRANEAN SLURRY INJECTION SYSTEMApr 08, 24Jan 23, 25Not available
2025/0003,167 Systems and Methods to Provide Pressed and Aggregate Filled Concavities for Improving Ground Stiffness and UniformityJul 09, 24Jan 02, 25Ingios Geotechnics, Inc.
2024/0318,396 Method for manufacturing an element comprising a grout activation cycleJun 23, 22Sep 26, 24Not available
2024/0318,080 METHOD FOR PRODUCTION OF A MODIFIED CEMENT POWDER AND A METHOD FOR SOIL IMPROVEMENT WITH THE MODIFIED CEMENT POWDERMar 24, 23Sep 26, 24Not available
2024/0318,400 ENGINEERING METHOD FOR REINFORCING AND LIFTING A SUNKEN FOUNDATION OF A RESIDENTIAL BUILDINGMay 30, 24Sep 26, 24Not available
2024/0309,599 ORGANIC FIBER REINFORCED GRASS TURFMar 13, 24Sep 19, 24TARKETT SPORTS CANADA INC.
2024/0309,601 LIFTING AND REINFORCING PROCESS FOR DUST-FREE FACTORY FLOORMay 28, 24Sep 19, 24Not available
2024/0279,898 Building Foundation and Soil Stabilization Method and SystemMay 03, 24Aug 22, 24Aquadation LLC
2024/0271,382 DRILLING TOOL AND METHOD FOR CREATING A BORE IN THE GROUNDMay 25, 22Aug 15, 24Bauer Spezialtiefbau GmbH
2024/0263,074 BIOCEMENTATION SYSTEMS AND METHODSMar 28, 24Aug 08, 24Not available
2024/0263,073 METHOD FOR INSTALLING CHEMICAL POLYMER DEEP SOIL STABILIZATION COLUMNS AND SAND COLUMNSApr 17, 24Aug 08, 24Saudi Arabian Oil Company
2024/0229,400 METHOD FOR REINFORCING SOFT GROUND BY POST-GROUTING COMBINED WITH AIR-BOOSTED VACUUM PRELOADINGOct 24, 23Jul 11, 24Not available
2024/0191,452 AUTOMATIC PILOT VALVE SYSTEM FOR FOUNDATION TOOLINGNov 08, 23Jun 13, 24Not available
2024/0191,136 METHODS AND COMPOSITIONS FOR DUST AND SOIL EROSION CONTROLApr 27, 22Jun 13, 24GMCO Corporation
2024/0159,007 Sediment Control Device and Methods of Using SameNov 15, 23May 16, 24Not available
2024/0133,144 METHOD FOR REINFORCING SOFT GROUND BY POST-GROUTING COMBINED WITH AIR-BOOSTED VACUUM PRELOADINGOct 23, 23Apr 25, 24Not available

Showing 1 to 20 of 215 results