2025/0019,918 | METHOD FOR DESIGNING A DRAINAGE WELL NETWORK PATTERN AND CONCEIVING SAME | Mar 28, 24 | Jan 16, 25 | EDAPHIS INC. |
2023/0392,335 | SEGMENTAL METHOD FOR INSTALLING WICK DRAINS | Apr 07, 23 | Dec 07, 23 | Not available |
2023/0349,119 | SYSTEMS, METHODS, AND COMPUTER PROGRAM PRODUCTS FOR DELIVERING FLUID AT A WORKSITE | Apr 27, 22 | Nov 02, 23 | Caterpillar Paving Products Inc. |
2023/0151,574 | SOFT SOIL FOUNDATION SINGLE-HOLE DEPTH AIR COMPRESSION DRAINAGE DEVICE AND WORKING METHOD THEREOF | Nov 03, 22 | May 18, 23 | Not available |
2022/0341,116 | METHOD FOR FOUNDATION CONSOLIDATION COMBINING VACUUM PRELOADING AND GEOMEMBRANE BAG ASSEMBLY LOADING | Apr 21, 22 | Oct 27, 22 | Not available |
2022/0145,545 | Shear Resistant Drain System for Improving Weak Foundation Soils | Nov 08, 21 | May 12, 22 | Not available |
2022/0056,656 | WICK DRAIN SHOE ASSEMBLIES, SYSTEMS, AND METHODS | Mar 30, 21 | Feb 24, 22 | Not available |
2022/0025,602 | WICK DRAIN SHOE SYSTEMS AND METHODS | Jul 21, 21 | Jan 27, 22 | Not available |
2021/0156,103 | DEVICE AND METHOD FOR TREATING SOFT SOIL FOUNDATIONS | May 11, 20 | May 27, 21 | Not available |
2021/0062,447 | PASSIVE TAILINGS COMPACTOR | Jan 22, 19 | Mar 04, 21 | Not available |
2019/0177,943 | ARRANGEMENT WITH A HOLLOW MANDREL FOR INTRODUCING DRAINAGE RIBBONS IN A SUBSOIL | Jun 19, 17 | Jun 13, 19 | BAGGERMAATSCHAPPIJ BOSKALIS B.V. |
2019/0153,691 | DEVICE FOR SOFT SOIL FOUNDATION TREATMENT BY MEANS OF VACUUM-MEMBRANE-FREE VACUUM PRELOADING AND TREATMENT METHOD | Jul 05, 18 | May 23, 19 | Not available |
2019/0040,599 | MACHINE AND METHOD FOR INSTALLING VERTICAL DRAINS IN THE GROUND | Feb 14, 17 | Feb 07, 19 | Not available |
2018/0327,991 | SYSTEM AND METHOD FOR CONTROLLING LAND DEFORMATION, AND METHOD FOR OPTIMAL DESIGN OF WELL IN SYSTEM FOR CONTROLLING LAND DEFORMATION | Apr 27, 16 | Nov 15, 18 | Not available |
2018/0282,966 | DEVICES USED IN LABORATORIES TO MEASURE HORIZONTAL DISPLACEMENT OF SOIL AROUND A FOUNDATION TO BE TREATED BY VACUUM PRELOADING, AND MEASUREMENT METHODS | Sep 22, 17 | Oct 04, 18 | WENZHOU UNIVERSITY |
2017/0030,046 | Apparatus and Method for Stabilizing a Slab Foundation | Oct 14, 16 | Feb 02, 17 | Not available |
2015/0233,072 | APPARATUS FOR CONTROLLING LIQUID ON A SITE | Feb 14, 14 | Aug 20, 15 | Groupe Mammut Inc. |
2015/0233,078 | SHORING SYSTEM USING AT LEAST ONE LIQUID-CONTROLLING SLIDE RAIL | Feb 13, 15 | Aug 20, 15 | Groupe Mammut Inc. |
2014/0248,084 | APPARATUS AND METHOD FOR CHANNELLING GROUNDWATER | Aug 03, 12 | Sep 04, 14 | Not available |
2013/0279,984 | PNEUMATIC ANCHORING SYSTEM FOR WICK DRAINS | Oct 15, 12 | Oct 24, 13 | Not available |