2025/0109,334 | COMPOSITIONS THAT INCLUDE SAND AND A STABILIZING AGENT AND RELATED METHODS | Oct 02, 23 | Apr 03, 25 | Not available |
2025/0109,561 | METHOD FOR FABRICATING A GRAVITY-BASED STRUCTURE (GBS) AT A SPECIALIZED FABRICATION SITE | Oct 14, 22 | Apr 03, 25 | Publichnoe Aktsionernoe Obshchestvo "NOVATEK" |
2025/0109,562 | FOUNDATION SUPPORT SYSTEM SHAFTS, ASSEMBLIES AND METHODS WITH ASYMMETRIC TORQUE TRANSMITTING DISTAL END EDGE TEETH | Sep 29, 23 | Apr 03, 25 | Not available |
2025/0109,563 | ALTERNATIVE PILE STRUCTURES | Oct 02, 23 | Apr 03, 25 | Not available |
2025/0109,564 | METHODS AND APPARATUS FOR BUILDING EXPANDED SHAFT AUGURED FOUNDATION ELEMENTS | Jan 13, 23 | Apr 03, 25 | Geopier Foundation Company, Inc. |
2025/0109,565 | MULTILAYER INTEGRAL GEOGRIDS HAVING A CELLULAR LAYER STRUCTURE, AND METHODS OF MAKING AND USING SAME | Oct 11, 24 | Apr 03, 25 | Tensar International Corporation |
2025/0109,566 | TURNING EARTH ANCHOR STRUCTURE FOR SUPPRESSING TOP DISPLACEMENT, AND TWO-ROW SELF-SUPPORTING TEMPORARY EARTH RETAINING STRUCTURE HAVING A MANUAL RESISTOR BLOCK | Sep 10, 24 | Apr 03, 25 | Not available |
2025/0109,890 | CAPPING APPARATUS AND METHOD FOR IN-GROUND HEAT EXCHANGERS | May 31, 23 | Apr 03, 25 | Not available |
2025/0101,700 | DRILLING DEVICE FOR REINFORCED CONCRETE BORED PILE | Jun 27, 24 | Mar 27, 25 | Not available |
2025/0101,703 | NONWOVEN COMPOSITE GEOTEXTILE SILT FENCE FOR TRENCH AND TRENCHLESS INSTALLATION AND GEOTEXTILE THEREFORE | Sep 27, 24 | Mar 27, 25 | Not available |
2025/0101,698 | FOUNDATION PILES, SYSTEMS, ASSEMBLIES, AND METHODS | Apr 12, 24 | Mar 27, 25 | Not available |
2025/0101,701 | PRE-DISINTEGRATED SOFT ROCK EMBANKMENT STRUCTURE BASED ON SPATIAL FUNCTION ZONES AND DESIGN METHOD THEREOF | Apr 22, 24 | Mar 27, 25 | Changsha University of Science & Technology |
2025/0101,704 | Underground space frame structure and construction method thereof | Jun 15, 24 | Mar 27, 25 | Not available |
2025/0101,699 | SEISMIC REMEDIATION DEVICES, SYSTEMS, AND METHODS | Dec 09, 24 | Mar 27, 25 | Not available |
2025/0101,702 | WOVEN GEOTEXTILE SILT FENCE WITH STABILIZING FEATURES FOR TRENCH OR TRENCHLESS INSTALLATIONS | Sep 27, 24 | Mar 27, 25 | Not available |
2025/0101,705 | SIDE DRAIN FOR FOOTING OF AN EDIFICE FOR CHANNELING WATER SEEPAGE IN A BASEMENT OR SUBTERRANEAN AREA | Sep 18, 24 | Mar 27, 25 | Not available |
2025/0092,627 | INTELLIGENT CONSTRUCTION CONTROL METHOD AND SYSTEM FOR JET GROUTING PILE BASED ON STRATUM INFORMATION INVERSION | Jul 04, 24 | Mar 20, 25 | Shandong University; Shandong Jianzhu University; |
2025/0092,631 | PRE-FORMED FOUNDATION PIER VAPOR BARRIER WRAPAND METHOD OF MANUFACTURING | Sep 17, 24 | Mar 20, 25 | Not available |
2025/0092,628 | SPACE ANCHORS FOR USE ON THE MOON, MARS AND OTHER EXTRATERRESTRIAL BODIES | Sep 16, 23 | Mar 20, 25 | Not available |
2025/0092,625 | HEAT COLLECTION BAG, DEVICE AND METHOD FOR SOLIDIFYING AND FILLING CALCIUM SAND FOUNDATION | Dec 12, 23 | Mar 20, 25 | INSTITUTE OF ROCK AND SOIL MECHANICS, CHINESE ACADEMY OF SCIENCES |