E01D 2/00

Technology



back to "E01D 2/00" profile

More Results

Patent/Pub #TitleFiling DateIssue/Publication DatePatent Owner
2024/0218,616 TRANSPORTABLE MODULAR BRIDGEApr 08, 22Jul 04, 24Not available
2023/0167,613 VIADUCT STRUCTUREJan 11, 23Jun 01, 23Not available
2022/0205,193 LONG SPAN POST TENSIONED BRIDGE DESIGNSAug 16, 21Jun 30, 22AEEE Capital Holding & Advisory Group
2022/0025,591 SYSTEM FOR CONSTRUCTION OF DOUBLE U AND SINGLE U STEEL CONCRETE COMPOSITE STRUCTURE FOR BRIDGESFeb 20, 19Jan 27, 22Not available
2021/0017,722 SHALLOW SINGLE PLATE STEEL TUB GIRDERJun 15, 20Jan 21, 21Not available
2020/0354,905 PREFABRICATED, PRESTRESSED BRIDGE MODULEJul 21, 20Nov 12, 20Valmont Industries Inc.
2019/0276,994 HYBRID COMPOSITE CONCRETE BRIDGE AND METHOD OF ASSEMBLINGMar 12, 19Sep 12, 19University of Maine System Board of Trustees
2018/0238,001 PRE-ENGINEERED FLAT-PACK BRIDGESep 01, 16Aug 23, 18CAPITAL PROJECT MANAGEMENT
2015/0292,168 DeckApr 06, 15Oct 15, 15Not available
2013/0104,320 COMPOSITE GIRDER FOR BRIDGE CONSTRUCTIONApr 01, 11May 02, 13HYEDONG BRIDGE CO., LTD
2011/0277,403 HANDRAIL CONSTRUCTIONJan 12, 10Nov 17, 11FIBERCORE IP B.V.
2010/0192,313 MODULAR STEEL BRIDGEAug 16, 07Aug 05, 10RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGY
2010/0139,016 BRIDGE AND METHOD FOR MANUFACTURING THE BRIDGEJun 20, 06Jun 10, 10Not available
2009/0084,048 U-SHAPED SPAN FOR RAILWAY TRACKFeb 13, 06Apr 02, 09SYSTRA
2006/0265,819 Bend steel plate girder system for bridgesApr 17, 06Nov 30, 06NUTECH VENTURES
2006/0137,115 Prestressed composite girder, continuous prestressed composite girder structure and methods of fabricating and connecting the sameDec 24, 03Jun 29, 06KOO, MIN-SE