2025/0109,556 | Method and Apparatus to Infer Structural Response from User-Device Measurements | Dec 11, 24 | Apr 03, 25 | Not available |
2025/0101,695 | TRANSPARENT OR TRANSLUCENT PANEL SYSTEMS, RELATED SYSTEMS, AND RELATED METHODS | Dec 09, 24 | Mar 27, 25 | Contech Engineered Solutions LLC |
2025/0092,621 | EASILY MAINTAINABLE ASSEMBLY-TYPE BRIDGE EXPANSION JOINT STRUCTURE AND CONSTRUCTION METHOD THEREOF | Nov 18, 24 | Mar 20, 25 | Not available |
2025/0091,944 | Pultruded GFRP Reinforcing Bars, Dowels and Profiles with Carbon Nanotubes | Dec 02, 24 | Mar 20, 25 | UNM Rainforest Innovations |
2025/0083,774 | GANGPLANK SAFETY DEPLOYMENT SYSTEM | Jan 12, 23 | Mar 13, 25 | MODALINTA PTE LIMITED |
2025/0075,451 | Scaffold Assembly And Method Of Use | Aug 30, 23 | Mar 06, 25 | Not available |
2025/0066,638 | DUCTILE MATERIAL, METHOD FOR MANUFACTURING DUCTILE MEMBER, AND ANTI-COLLISION DEVICE FOR BRIDGE PIERS | May 05, 23 | Feb 27, 25 | SHANDONG UNIVERSITY; SHANDONG TRAFFIC ENGINEERING SUPERVISION CONSULTING CO., LTD.; |
2025/0052,019 | COMPOSITE STRUCTURAL PANEL AND METHOD OF FABRICATION | Oct 28, 24 | Feb 13, 25 | Composites Intellectual Holdings, Inc. |
2025/0034,821 | FABRICATED RAPID CONSTRUCTION PLATFORM FOR BRIDGE AND CONTROL METHOD THEREFOR | Oct 09, 21 | Jan 30, 25 | Guangxi Transportation Science and Technology Group Co., Ltd. |
2025/0027,281 | METHOD FOR TRANSFORMING A CABLE SUPPORTED BRIDGE FROM A FIRST BRIDGE STATE INTO A SECOND BRIDGE STATE AND CABLE SUPPORTED BRIDGE | Jul 19, 23 | Jan 23, 25 | Not available |
2025/0027,282 | PRESTRESSED STRENGTHENING APPARATUS FOR PREFABRICATED HIGHWAY BRIDGE | Dec 28, 23 | Jan 23, 25 | Not available |
2024/0410,445 | CABLE WIRE CONNECTOR | Feb 03, 24 | Dec 12, 24 | Not available |
2024/0392,856 | Multi-Directional Broadband Tuned Mass Damper and Design Method Thereof | Jul 25, 23 | Nov 28, 24 | Not available |
2024/0393,197 | COLD-CAST ANCHOR STAY CABLE CONTAINING FIBER GRATING STRAIN AND INSTALLATION METHOD THEREOF | Jun 16, 23 | Nov 28, 24 | Not available |
2024/0392,519 | FLEXIBLE BRIDGE ABUTMENT | Sep 16, 22 | Nov 28, 24 | Not available |
2024/0368,849 | Transportation Pathway Elevation Separator | Jul 13, 24 | Nov 07, 24 | Not available |
2024/0368,903 | ERECTED PLATFORM | Jul 09, 24 | Nov 07, 24 | Not available |
2024/0360,634 | WALKWAY STRUCTURE AND OVERHEAD HOIST TRANSFER SYSTEM INCLUDING THE SAME | Apr 23, 24 | Oct 31, 24 | Not available |
2024/0352,688 | STIFFENING GIRDER ERECTION METHOD OF GROUND-ANCHORED SUSPENSION BRIDGE | Jul 02, 24 | Oct 24, 24 | Not available |
2024/0344,280 | SEGMENTAL PRECAST COMPOSITE-MATERIAL COMPOSITE-SLAB COMPOSITE BEAM AND CONSTRUCTION METHOD THEREOF | Apr 11, 23 | Oct 17, 24 | Not available |