Modular hybrid low emissions power for hydrocarbon extraction

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE50263
SERIAL NO

16745724

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for supplying electric power includes: a plurality of electric motors coupled to well treatment pumps; a mobile substation that receives power from a utility electric grid; a plurality of mobile electric power generating units; a controller configured to (i) receive a total required flow rate of the liquid; (ii) calculate a total amount of electric power required to achieve the required total flow rate; (iii) receive an amount of power available from the utility electric grid; (iv) direct the substation to provide electric power to the plurality of electric motors; and (v), direct one or more electric power generating units in the plurality of electric power generating units to provide electric power to the plurality of electric motors according to a priority order to meet the total amount of electric power, if the required amount of electric power exceeds the amount of power available from the utility grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BJ ENERGY SOLUTIONS LLC (FORMERLY TES ASSET ACQUISITION LLC)700 LOUISIANA STREET SUITE 2700 HOUSTON TX 77002

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burnette, Blake C Tomball, US 16 1216
Dehring, Pierce Tomball, US 3 411
Vicknair, Bruce A The Woodlands, US 13 1396

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jul 7, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 7, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00