Perforating gun and detonator assembly

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE50204
SERIAL NO

16287150

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an aspect, a perforating gun assembly and a detonator assembly are provided. The detonator assembly includes at least a shell, and more than one electrically contactable component that is configured for being electrically contactably received by the perforating gun assembly without using a wired electrical connection, but rather forms the electrical connection merely by contact with at least one of the more than one electrically contactable components. According to an aspect, the detonator assembly includes a selective detonator assembly. A method of assembling the perforating gun assembly including the detonator assembly is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYNAENERGETICS EUROPE GMBHKAISERSTRASSE 3 TROISDORF 53840

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McNelis, Liam Bonn, DE 74 1875
Preiss, Frank Haron Bonn, DE 38 1537
Scharf, Thilo Letterkenny, IE 83 2123

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 12, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 12, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00