Modular screed plate assembly and method of assembling a screed plate

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE50152
SERIAL NO

17091517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The modular screed plate assembly and method has a road paver/finisher, a structural/conductor plate and modular screed plates. The road paver/finisher has a paver under side, a power source and a heating element, for heating the modular screed plates. The modular screed plates have coupling elements, and retainer quick-connect/releases, and align as a modular screed plate array, providing a tensionally yielding gap allowing the modular screed plate array to absorb pressures from paving operations. The structural/conductor plate couples with the coupling elements and has screed plate retaining locks to securely receives the retainer quick-connect/releases, in order to secure itself to the modular screed plates. The structural/conductor plate receives heat directly from the heating element, and provides indirect heat to the modular screed plate array.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AXENOX LLCP O BOX 658 POWELL WY 82435

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frost, Stuart Anthony Cowley, US 23 48
Frost,, Jr David Michael Cowley, US 23 48

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00