System and method for controlling an electricity supply

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE49870
SERIAL NO

16109099

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for controlling an electricity supply to a load comprises at least one battery for storing energy. The system also comprises a controller for determining when to switch between a first mode wherein electricity is supplied to the load from a mains electricity circuit; and a discharging mode wherein electricity is supplied from the battery to the load via the mains electricity circuit. The determining is based on information associated with the electricity supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE TECHNOLOGY PARTNERSHIP PLCMELBOURN SCIENCE PARK CAMBRIDGE ROAD MELBOURN ROYSTON HERTS SG8 6EE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anderson, David R Melbourn Royston, GB 101 4186
Lumb, Matthew C B Melbourn Royston, GB 3 1
Palmer, Mathew R Melbourn Royston, GB 5 259
Rix, Antony W Melbourn Royston, GB 12 192
Smith, David S Melbourn Royston, GB 49 725

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Sep 12, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 12, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 12, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00