Cell and electrochemical device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE49672
SERIAL NO

17132483

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure provides a cell and an electrochemical device. The cell comprises: a first electrode plate comprising a first current collector and a first active material layer, a second electrode plate comprising a second current collector and a second active material layer; a first electrode tab, a second electrode tab, a separator. The first current collector has a first surface uncoated region; the second current collector has a second surface uncoated region; the first electrode tab is provided on the first surface uncoated region, the second electrode tab is provided on the second surface uncoated region. The first electrode tab and/or the second electrode tab are enlarged in length and width. When the cell is subjected to a mechanical shock, the first electrode tab and the second electrode tab are deformed to puncture the separator therebetween, so the first current collector and the second current collector are electrically connected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DONGGUAN AMPEREX TECHNOLOGY LIMITEDNO 1 INDUSTRIAL WEST ROAD SONGSHAN LAKE HIGH-TECH INDUSTRIAL DEVELOPMENT ZONE DONGGUAN GUANGDONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chong, Jin Chong, CN 7 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 26, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 26, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 26, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00