Dynamic measurement of frequency synthesizer noise spurs or phase noise

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE49571
SERIAL NO

17154611

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of measuring phase noise (PN). A PLL frequency synthesizer is provided including a first phase frequency detector (PFD) receiving a reference frequency signal coupled to a first charge pump (CP) coupled to a VCO having an output fedback to the first PFD through a feedback divider that provides a divided frequency signal to the first PFD which outputs an error signal, and PN measurement circuitry including a replica CP coupled to an output of a second PFD or the first PFD. The error signal is received at the replica CP or the divided and reference frequency signal are received at the second PFD, wherein the replica CP outputs a scaled phase error current which is current-to-voltage converted and amplified to provide an amplified phase error voltage, and digitized to provide a digital phase error signal. The digital phase error signal is frequency analyzed to generate a PN measurement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TEXAS INSTRUMENTS INCORPORATEDDALLAS TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ganesan, Raghu Karnataka, IN 41 207
Samala, Sreekiran Plano, US 18 218
Subburaj, Karthik Karnataka, IN 88 993

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00