Stressed substrates for transient electronic systems

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE49059
SERIAL NO

16537258

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A stressed substrate for transient electronic systems (i.e., electronic systems that visually disappear when triggered to do so) that includes one or more stress-engineered layers that store potential energy in the form of a significant internal stress. An associated trigger mechanism is also provided that, when triggered, causes an initial fracture in the stressed substrate, whereby the fracture energy nearly instantaneously travels throughout the stressed substrate, causing the stressed substrate to shatter into multiple small (e.g., micron-sized) pieces that are difficult to detect. The internal stress is incorporated into the stressed substrate through strategies similar to glass tempering (for example through heat or chemical treatment), or by depositing thin-film layers with large amounts of stress. Patterned fracture features are optionally provided to control the final fractured particle size. Electronic systems built on the substrate are entirely destroyed and dispersed during the transience event.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SRI INTERNATIONAL333 RAVENSWOOD AVENUE MENLO PARK CA 94025

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
De, Bruyker Dirk San Jose, US 34 377
Garner, Sean R Redwood City, US 6 171
Limb, Scott J H Palo Alto, US 15 374
Lu, JengPing Fremont, US 73 470
Whiting, Gregory L Boulder, US 34 309

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 3, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 3, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 3, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00