System and method for recalculating analysis report of 3D scan data
Number of patents in Portfolio can not be more than 2000
United States of America
Stats
-
Mar 29, 2022
Grant Date -
N/A
app pub date -
Jun 7, 2019
filing date -
Jun 7, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
Disclosed is a system and method for allowing analysis results of scan data to have supplemental geometry and various measurements generated from the supplemental geometry or mutual common relations between geometric tolerances, and when the scan data changes, the analysis results according to the related data are recalculated in real time in order to simplify the repetitive inspection process according to the scan data changes.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
3D SYSTEMS INC | ROCK HILL SC |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Bae, Seock Hoon | Los Altos, US | 9 | 31 |
# of filed Patents : 9 Total Citations : 31 | |||
Cho, Sung Wook | Gangnam-gu, KR | 37 | 122 |
# of filed Patents : 37 Total Citations : 122 | |||
Kim, Seung Yob | San Diego, US | 3 | 4 |
# of filed Patents : 3 Total Citations : 4 | |||
Lee, Dong Hoon | Goyang, KR | 529 | 2741 |
# of filed Patents : 529 Total Citations : 2741 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Sep 29, 2025 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Sep 29, 2029 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Sep 29, 2033 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Matter Detail

Renewals Detail
