Information processing apparatus, method for controlling power state shift and clearing or not clearing a shift time measured

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE48925
SERIAL NO

15933182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An information processing apparatus operating in a first power state, a second power state, a third power state, and fourth power state includes a power control unit configured to the third power state to the fourth power state when a first shift time is measured, and a control unit configured to, when the power control unit has shifted the power state of the information processing apparatus from the third power state to the first power state, clear the measured time and not to, when the power control unit has shifted the power state of the information processing apparatus from the third power state to the second power state, clear the measured time clear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHAJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takizawa, Masahiro Kawasaki, JP 106 2380

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Aug 8, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 8, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 8, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00