Gusset plate connection of beam to column

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE48705
SERIAL NO

16733818

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A joint connection structure of a building framework includes a column assembly including a column and a pair of gusset plates connected to the column on opposite sides of the column and extending laterally outward from the column. A full-length beams assembly includes a full-length beam having upper and lower flanges and an end portion received between the gusset plates. A connecting member is operatively attached by welding to at least one of the flanges of the full-length beam. The connecting member is bolted to at least one of the gusset plates of the column assembly to connect the full-length beam assembly to the column assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITEK HOLDINGS INC802 WEST STREET WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adams, Jared J Mission Viejo, US 11 87
Houghton, David L Laguna Niguel, US 16 485
Karns, Jesse Mission Viejo, US 9 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 24, 2025
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 24, 2029
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 24, 2033
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00