Connection terminal, connection device, method for manufacturing the device, motor using the device, and compressor using the motor and blower using the motor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO RE48516
SERIAL NO

15711759

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Connection terminal (10) according to the present invention includes a tab part and not smaller than four pinching plates (12) that hold an aluminum electric wire. Pinching plates (12) each include first slit (13) and contact surfaces (14). First slit (13) has a first open end located in one side of the slit, and a first tip located in the other side. The aluminum electric wire is inserted into first slit (13). Contact surfaces (14) are in contact with the aluminum electric wire that is press-fitted into first slit (13). A contact area in which contact surfaces (14) are in contact with a core wire is an area of 100% to 200% of a radial cross-sectional area of the core wire.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTDOSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kondo, Kenji Nara, JP 251 3493
Tamamura, Shuhei Shiga, JP 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 13, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 13, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00