Tire chock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE46876
SERIAL NO

14613875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tire chock having an at least partially threaded rod; a first trunnion having an aperture therethrough that receives the rod; first and second locking members, one locking member being rotatably fixed relative to the rod, the other locking member being rotatably fixed relative to the first trunnion. A tire chock may alternatively have an at least partially threaded rod; an upper trunnion rotatably attached to the rod; a lower trunnion threadedly attached to the rod, the lower trunnion translating axially relative to the rod upon rotation of the rod relative to the lower trunnion; a pair of linkage arms, the pair of linkage arms forming an X-shape, each linkage arm being connected to the lower trunnion by a drive arm and being connected to the upper trunnion by a support arm, wherein, as the rod is rotated relative to the lower trunnion, the linkage arms expand or contract.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORCO INDUSTRIES INC365 W VICTORIA STREET COMPTON CA 90220

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Garceau, Bernard F Vandalia, US 81 667

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 29, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 29, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00