Forward converter having a primary-side current sense circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO RE46715
SERIAL NO

15347484

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A load control device for controlling the amount of power delivered to an electrical load (e.g., an LED light source) comprises an isolated forward converter comprising a transformer, a controller, and a current sense circuit operable to receive a sense voltage representative of a primary current conducting through to a primary winding of the transformer. The primary winding is coupled in series with a semiconductor switch, while a secondary winding is adapted to be operatively coupled to the load. The forward converter comprises a sense resistor coupled in series with the primary winding for producing the sense voltage that is representative of the primary current. The current sense circuit receives the sense voltage and averages the sense voltage when the semiconductor switch is conductive, so as to generate a load current control signal that is representative of a real component of a load current conducted through the load.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUTRON TECHNOLOGY COMPANY LLC7200 SUTER ROAD COOPERSBURG PA 18036-1299

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Veskovic, Dragan Allentown, US 65 2802

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00