Power-efficient successive-approximation analog-to-digital converter using LSB averaging

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9998137
SERIAL NO

15706712

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An Analog-to-Digital Converter (ADC) device includes an input interface and conversion circuitry. The input interface is configured to receive an analog input signal. The conversion circuitry is configured to convert the analog input signal into a digital word by performing a sequence of iterations to determine respective bits of the digital word, wherein the sequence (i) progresses in descending order of bit significance of the bits, from a Most Significant Bit (MSB) to a Least Significant Bit (LSB), and (ii) repeats evaluation of a predefined number of Least-Significant Bits (LSBs) of the digital word multiple times, and determining a final value of the digital word by averaging the repeatedly-evaluated LSBs.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARVELL ASIA PTE LTDSINGAPORE CITY SINGAPORE CITY SINGAPORE

International Classification(s)

loading....
  • 2017 Application Filing Year
  • H03M Class
  • 1979 Applications Filed
  • 1704 Patents Issued To-Date
  • 86.11 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2017201820192020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Xiang San Jose, US 1551 13938
Paramanandam, Arvind Anumula Pleasanton, US 3 7
Upadhyaya, Prasanna San Jose, US 3 7
Wang, Xiaoyue San Jose, US 36 232

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 1 Citation Count
  • H03M Class
  • 19 % this patent is cited more than
  • 7 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges2479111012956101 - 1011 - 2021 - 3031 - 4041 - 5051 - 600501001502002503003504004505005506006507007508008509009501000

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029