Method for controlling a technical system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997912
SERIAL NO

15015393

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for controlling a technical system including a power grid, connected to at least one energy supply system. The method ensures that the consumption of electrical energy of the grid is within a given load curve by avoiding or compensating peak loads; including the steps of: a) providing data of the total load occurring in the grid to a load data processor; b) the processor processing said data and determining curves of a plurality of load components of the total load; c) determining future load curves for each component for a time period ahead; d) superimposing the future load curves and determining a future total load curve for the future total load and future peak loads; and e) controlling the technical and/or energy supply systems based on the determined future total load curve to avoid exceeding given load limits and future peak loads or allocate energy required in the future.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHWEIZERISCHE BUNDESBAHNEN SBB3000 BERN 65

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bosch, Julius Olten, CH 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00