Generating electric substation load transfer control parameters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997911
SERIAL NO

14601554

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for generating electric substation load transfer control parameters includes adjusting elements in a fundamental scale matrix according to a condition change of a power grid, wherein the fundamental scale matrix is constructed based on the topology structure of the power grid, and the elements in the fundamental scale matrix represent switch information and risk values of paths between nodes of the power grid, wherein the switch information represents number of switching times required for connecting two nodes of the power grid; and performing operations on the adjusted fundamental scale matrix to generate switch information and risk values of paths for electric substation load transfer control, as electric substation load transfer control parameters.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UTOPUS INSIGHTS INC115 EAST STEVENS AVENUE SUITE 202 VALHALLA NY 10595

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huang, Zhen Beijing, CN 196 743
Jin, Feng Shanghai, CN 106 619
Tian, Qi Ming Beijing, CN 28 197
Yin, Wen Jun Beijing, CN 66 704
Zhang, Ya Nan Shanghai, CN 14 25
Zhao, Ming Beijing, CN 290 4711

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00