Power supply circuit, and method for controlling the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997910
SERIAL NO

14685517

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply circuit according to an embodiment has a plurality of voltage sources, a switch circuit that switches between a state in which the plurality of voltage sources are connected in series and a state in which the plurality of voltage sources are connected in parallel, and a voltage control circuit that boosts an input voltage. The switch circuit connects the plurality of voltage sources in series, supplies an output of the plurality of serially connected voltage sources to an output node of the voltage control circuit, thereafter connects the plurality of voltage sources in parallel, and supplies outputs of the plurality of parallel-connected voltage sources to the voltage control circuit. The voltage control circuit boosts voltages of the plurality of parallel-connected voltage sources.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENESAS ELECTRONICS CORPORATION2-24 TOYOSU 3-CHOME KOTO-KU TOKYO 135-0061

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikenaga, Yoshifumi Kawasaki, JP 23 121

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00