Assembled battery and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997760
SERIAL NO

14968394

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combined battery (100) comprising a plurality of flat-type cells (10A to 10F) by laminating thereof so that polarity of electrode tabs (11A to 11F and 12A to 12F) is alternately set, wherein welding parts to connect in series the flat cells themselves, to compose a set when all the flat-type cells (10A to 10F) are laminated, are separated at a plurality of positions of the combined battery, and the flat-type cells having such a structure that all the flat-type cells are electrically connected in series by welding each of the welding parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENVISION AESC JAPAN LTD10-1 HIRONODAI 2-CHOME ZAMA-SHI KANAGAWA 252-0012

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Amagai, Ryuichi Kanagawa, JP 27 364
Enokida, Tsuyoshi Kanagawa, JP 4 76
Hayami, Muneto Kanagawa, JP 6 141
Kishimoto, Hiroaki Kanagawa, JP 24 164
Ota, Masayasu Kanagawa, JP 6 120
Segawa, Teruo Kanagawa, JP 14 178
Tanjou, Yuuji Kanagawa, JP 12 245
Watanabe, Masashi Kanagawa, JP 172 1418

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00