Rechargeable battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997749
APP PUB NO 20160301042A1
SERIAL NO

15068246

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rechargeable battery includes: an electrode assembly comprising: a first electrode and a second electrode; a case comprising an opening at a side of the case, the case accommodating the electrode assembly; a cap assembly comprising a cap plate covering the opening of the case, a first terminal protruding out of the cap plate and electrically coupled to a first electrode, and a second terminal protruding out of the cap plate and electrically coupled to a second electrode; a first current collector coupled to a lower part of the cap assembly and having a first side electrically connected to the first terminal and a second side coupled to the first electrode; and a deformation preventer coupled to the lower part of the cap assembly and formed to accommodate a part of the first current collector.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Yu-Na Yongin-si, KR 22 331
Yoon, Jang-Ho Yongin-si, KR 11 70

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00