Power supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997748
APP PUB NO 20140356693A1
SERIAL NO

14372480

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device (1) includes a battery cell assembly (2) being an assembly of battery cells (3) each having electrodes (4) and a battery connecting block (10) including a case body (11) including an adjacent first and second divided fixing portions (12, 13) connected to each other via a flexural deformation portion (14). The flexural deformation portion (14) includes a first rising linear portion (40) having one end fixed to the first divided fixing portion, a second rising linear portion (40) having one end fixed to the second divided fixing portion, first and second curve portions (41) bent at the other ends of the first and second rising linear portions (40) in a direction to come close to each other, and a linear portion (42) connecting the first and second curve portions to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAZAKI CORPORATION8-15 KONAN 1-CHOME MINATO-KU TOKYO 108-0075

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ogasawara, Shigeyuki Kakegawa, JP 42 360
Ota, Michio Kakegawa, JP 16 87
Yanagihara, Shinichi Kakegawa, JP 61 311

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00