Rechargeable battery having upper insulator member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997747
SERIAL NO

14200207

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rechargeable battery includes an electrode assembly including a first electrode and a second electrode, a case in which the electrode assembly is mounted, a cap plate coupled to the case, the cap plate including a short-circuit hole therethrough, a first terminal electrically connected to the first electrode, a second terminal electrically connected to the second electrode, an upper insulating member between the second terminal and the cap plate, the upper insulating member including a connection hole in fluid communication with the short-circuit hole, and an air vent hole spaced apart from the connection hole, and a short-circuit member in the short-circuit hole, the short-circuit member being between the cap plate and the upper insulating member, and the short-circuit member being configured to deform to electrically connect the first electrode with the second electrode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG SDI CO LTDGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guen, Min-Hyung Yongin-si, KR 42 206

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00