Semiconductor devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9997234
SERIAL NO

15654917

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device includes a control signal generation circuit and an input/output (I/O) control circuit. The control signal generation circuit generates first and second read control signals and first and second write control signals. One of the first and second read control signals and one of the first and second write control signals is selectively enabled according to a combination of first and second addresses for selecting a first I/O line or a second I/O line. The I/O control circuit outputs read data loaded on first and second internal I/O lines through any one of the first and second I/O lines in response to the first and second read control signals. In addition, the I/O control circuit outputs input data through any one of the first and second I/O lines in response to the first and second write control signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SK HYNIX INCGYEONGGI DO SOUTH KOREA GYEONGGI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jaeil Yongin-si, KR 31 35
Kim, Yong Mi Hwaseong-si, KR 29 121
Lee, Jae In Icheon-si, KR 33 117

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00