Lens array fabrication method, and film containing base plate and film attaching instrument employed in same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995856
SERIAL NO

15410698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lens array fabrication method for fabricating a lens array includes: receiving pins (16) of a film attaching instrument (jig) in second guide holes (10) of a film-containing base plate; bonding a placement area and an adhesion layer (F); removing the pins (16); causing a detachment between a first detachment film (C) and a pressure-sensitive adhesive optical film (D); separating three layers (D) to (F) from two layers (B) and (C); receiving the pins (16) in first guide holes (7) of a lens array main unit; fitting a film holding protrusion (15) in a depression part (6); bonding the film (D) to a bonding region (i); removing the pins (16); and causing a detachment between the film (D) and a second detachment film (E).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENPLAS CORPORATION30-1 NAMIKI 2-CHOME KAWAGUSHI-SHI SAITAMA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goto, Makoto Shizuoka, JP 78 1276
Hashimoto, Nobuhiro Shizuoko, JP 17 48
Morioka, Shimpei Kawaguchi, JP 60 426
Tanazawa, Masahiro Kawaguchi, JP 11 71

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00