Borehole fluid and/or casing effect correction for pulsed neutron measurements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995842
APP PUB NO 20160349399A1
SERIAL NO

14726111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining hydrogen index includes using measurements of gamma rays detected during operation of a pulsed neutron source and numbers of thermal neutron capture gamma rays made at at least two different axial spacings from a pulsed neutron source. Either a first ratio of or a first logarithm of the first ratio of the burst gamma rays is determined for a first and second axial distance from the neutron source. A second logarithm is determined of a second ratio of the thermal neutron capture gamma rays detected at a first axial spacing with respect to the numbers detected at a second axial spacing. A corrected second ratio of the numbers of thermal neutron capture gamma rays is determined using either (i) the first logarithm and (ii) the first ratio, and the second logarithm. The corrected second ratio is used to determine the hydrogen index.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHLUMBERGER TECHNOLOGY CORPORATION300 SCHLUMBERGER DRIVE SUGAR LAND TX 77478

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhou, Tong Sugar Land, US 235 2173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00