Systems and methods for constructing and testing composite photonic structures

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995690
SERIAL NO

15805706

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are disclosed relating to composite photonic materials used to design structures and detecting material deformation for the purpose of monitoring structural health of physical structures. According to one aspect, a composite structure is provided that includes a base material, an optical diffraction grating and one or more fluorophore materials constructed such that localized perturbations create a measureable change in the structure's diffraction pattern. An inspection device is also provided that is configured to detect perturbations in the composite structure. The inspection device is configured to emit an inspecting radiation into the structure and capture the refracted radiation and measure the change in the diffraction pattern and quantify the perturbation based on the wavelength and the angular information for the diffracted radiation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANYDHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Ghamdi, Abdullah S Dammam, SA 6 17
Al-Shahrani, Abdullah A Dammam, SA 7 33
Bovero, Enrico Dhahran, SA 32 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00