Control device for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995265
APP PUB NO 20160348631A1
SERIAL NO

15161834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine is provided with an EGR device and is configured to be capable of executing an operation based on a first air-fuel ratio and an operation based on a second air-fuel ratio leaner than the first air-fuel ratio. In a case where an ECU decreases the amount of air flowing into a combustion chamber and decreases an EGR rate in response to a predetermined torque reduction request for the internal combustion engine, the ECU performs the operation based on the first air-fuel ratio in a case where an immediately preceding EGR rate immediately before the torque reduction request is made is lower than a first threshold and performs a stratified combustion operation based on the second air-fuel ratio in a case where the immediately preceding EGR rate is equal to or higher than the first threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sadakane, Shinji Susono, JP 33 318

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00