Surrounding rock pretreatment method for TBM passing through round tunnel section with high rock-burst risk

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995139
APP PUB NO 20180010452A1
SERIAL NO

15632291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a surrounding rock pretreatment method for a TBM (tunnel boring machine) passing through a round tunnel section with high rock-burst risk. A technical solution of the present invention is as follows: the surrounding rock pretreatment method includes the following steps: 1. determining a pretreatment area, wherein an area in which a clear spacing between a to-be-constructed tunnel and an adjacent existing tunnel in a TBM tunneling direction is less than 2 times that of a tunnel diameter of the TBM to-be-constructed tunnel is the pretreatment area: 2. performing controlled blasting; 3. injecting high pressure water, and selecting part of blast holes I to perform cyclic water injection pressurizing; and 4, performing normal tunneling by the TBM.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWERCHINA HUADONG ENGINEERING CORPORATION LIMITEDHANGZHOU ZHEJIANG 311122

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Pingzhi Hangzhou, CN 1 1
Chu, Weijiang Hangzhou, CN 3 3
Hou, Jing Hangzhou, CN 11 7
Zhang, Chunsheng Hangzhou, CN 21 74
Zhou, Yong Hangzhou, CN 177 1511

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00