Dual fuel burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995122
SERIAL NO

14713677

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are disclosed that may include providing a dual fuel burner in a superheater truck to burn wellhead gas produced from a wellhead in a first fuel burner and burn at least one of methane, ethane, propane, butane, gasoline, diesel, liquified natural gas (LNG), natural gas liquids (NGLs), and wellhead gas in a second fuel burner to heat water and/or other chemicals used in hydrocarbon production and/or well completion processes, including, but not limited to hydraulic fracturing (fracking). The first fuel burner may be integrated with the second fuel burner such that fuel rail fingers of the first fuel burner are interstitially spaced with fuel rail fingers of the second fuel burner. The first fuel burner and the second fuel burner may be operated independently from each other. The first fuel burner and the second fuel burner may alternatively be operated simultaneously with each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADLER HOT OIL SERVICE LLC4907 SOUTH 4625 EAST VERNAL UT 84078

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Briggs, Paul Vernal, US 8 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00