Economical debris flow blocking dam structure and construction method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9995013
APP PUB NO 20170370062A1
SERIAL NO

15626111

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an economical debris flow blocking dam structure and a construction method thereof. The structure has an excavated foundation surface, and a dam body of the blocking dam is composed of a key wall arranged at a dam toe, dam body concrete wrapped on an outer surface of the whole blocking dam, concrete masonry block stones filled inside the blocking dam, and a plurality of drain holes formed in the dam body in a top and twin-side bottom shape; an open and centralized overflow weir is arranged on the top of the blocking dam; an overflow surface has a horizontal middle and extends to two sides along a longitudinal slope i of 10-20%; and the key wall is anchored on the foundation surface through joint bars stretching into bedrock, and an anti-scouring pit is formed close to a downstream side of the key wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POWERCHINA HUADONG ENGINEERING CORPORATION LIMITEDHANGZHOU ZHEJIANG 311122

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Dengyin Hangzhou, CN 1 2
Zhang, Gangping Hangzhou, CN 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00