Process for producing mesophase pitch by hydrogenation of high-temperature coal tar

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9994775
SERIAL NO

14372006

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing mesophase pitch from high-temperature coal tar comprises: removing salts and quinoline insoluble fraction from a high-temperature coal tar to obtain a decant oil; using the decant oil as a hydrogenation feedstock, or pre-distilling the decant oil to obtain a residue with a boiling point higher than 230 and formulating the residue into a hydrogenation feedstock; catalytic hydrorefining the hydrogenation feedstock to obtain a hydrofined oil; distilling the hydrofined oil to obtain hydrogenated pitch; and subjecting the hydrogenated pitch to the thermal polymerization to obtain the mesophase pitch. The process has features such as an easily controllable degree of hydrogenation, complete removal of impurities, good raw material flowability, not tending to form the carbon deposition and the coking during the process, and not tending to jam the reactor. The product has a high content of mesophase pitch, a low softening point and a low impurity content.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECO CARBON MATERIALS HOLDING (SHENZHEN) COMPANY LIMITEDQIANHAI COMPLEX A201 QIANWAN ROAD 1 QIANHAI SHENZHEN-HONG KONG COOPERATION ZONE SHENZHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Baoming Saihan District, CN 8 26
Lu, Junde Steve North Point, HK 1 9
Qiu, Jieshan Dalian, CN 4 9
Siu, Kam Shing Philip North Point, HK 1 9
Xiao, Nan Dalian, CN 41 280
Zhao, Hongmei Saihan District, CN 15 251

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00