Method of producing ultra-low density fiber composite materials

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9994712
SERIAL NO

15146942

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing ultra-low density fiber composite (ULDC) foam materials using natural fibers with gas injection through liquid foaming is disclosed, wherein in a particular embodiment includes also cellulose filaments. The method includes a continuous overflow foaming process and a novel apparatus to produce the ULDC materials. The disclosed ULDC composite foam produced includes moisture, mold, decay and fire resistant properties which can be used for building thermal and acoustic insulations, protection packaging, air filter products, hygiene products. The apparatus comprise a vessel, counter rotating dual impellor, a plurality of baffles and gas injection that produce.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FPINNOVATIONSPOINTE-CLAIRE QUÉBEC H9R 3J9

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ben, Yuxia Kirkland, CA 7 72
Brunette, Gilles Quebec, CA 10 55
Cai, Xiaolin Quebec, CA 13 46
Deng, Xixian (James) Quebec, CA 2 17
Dery, Nicolas Quebec, CA 1 14
Dorris, Gilles Marcel Quebec, CA 5 36
Lebel, Sebastien Quebec, CA 1 14
Ricard, Michelle Pointe-des-Cascades, CA 3 16
Sacciadis, George Laval, CA 2 14
Yang, Dian-Qing Quebec, CA 7 20
Zhang, Yaolin Zhang Quebec, CA 1 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00