Method for controlling a mineral material processing plant and a mineral material processing plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9993827
SERIAL NO

14431493

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mineral material processing plant and a method for controlling thereof. The mineral material processing plant includes at least one motor, at least one actuator, a feeder device, a control system, and an arrangement for recognizing a need to switch off a standby-mode. The control system is configured to control the processing plant in such a way that the need to switch off a standby mode is automatically recognized. In response to the recognized need to switch off the standby mode the running speed of a motor or motors of the mineral material processing plant is raised from a stand-by speed (Rsb) to a process speed (Rf); and the feeding of mineral material into the processing plant is enabled.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METSO OUTOTEC FINLAND OYLOKOMONKATU 3 TAMPERE 33900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Konttila, Juha Tampere, FI 1 1
Kujala, Toni Tampere, FI 2 5
Nieminen, Paavo Kangasala, FI 3 1
Permi, Sami Vesilahti, FI 3 8
Rantanen, Jukka-Pekka Tampere, FI 2 2
Tirranen, Juho Tampere, FI 2 4
Yla-Outinen, Kai Pirkkala, FI 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00