Rebounder assembly having an adjustable tension bed

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9993676
SERIAL NO

15535608

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A rebounder assembly (10) includes a rebounder bed (12), a rebounder frame (14), and a plurality of spaced apart rebounder connectors (15) that connect the rebounder bed (12) to the rebounder frame (14) in tension. At least one of the rebounder connectors (15) includes a resilient member (16) and a rebounder fastener (18). The rebounder fastener (18) includes an outer frame (224) that defines a portion of a first retaining area (220) and a first cantilevering arm (226) that extends away from the outer frame (224), the first cantilevering arm (226) defining at least a portion of a second retaining area (222). The resilient member (16) is selectively movable relative to the rebounder fastener (18) between a first position where the resilient member (16) engages the first retaining area (220), and a second position where the resilient member (16) engages the second retaining area (222) to selectively adjust the tension of the rebounder bed (12).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACTIVE FUN COMPANY LIMITED18/F ARION COMMERCIAL CENTRE 2-12 QUEEN'S ROAD WEST SHEUNG WAN HONG KONG

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guillot, Cyrille Queenstown, NZ 7 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 12, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 12, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00