Launcher and coupling system for guided wave mode cancellation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9991580
APP PUB NO 20180115044A1
SERIAL NO

15299564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Aspects of the subject disclosure may include, for example, a coupling module that includes a waveguide that guides a first electromagnetic wave conveying data from a transmitting device. A dielectric coupler receives the first electromagnetic wave from the waveguide to form a second electromagnetic wave, and that guides the second electromagnetic wave along the dielectric coupler adjacent to a transmission medium, and wherein the dielectric coupler has a length that supports a cancellation of at least one cancelled wave mode from a coupling of the second electromagnetic wave to the transmission medium.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AT&T INTELLECTUAL PROPERTY I L P754 PEACHTREE STREET NE SUITE 7C ATLANTA GA 30308

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barnickel, Donald J Flemington, US 480 82210
Barzegar, Farhad Branchburg, US 586 93048
Bennett, Robert Southold, US 603 83089
Gerszberg, Irwin Kendall Park, US 705 103011
Henry, Paul Shala Holmdel, US 643 103445
Willis,, III Thomas M Tinton Falls, US 545 93565

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00