Battery module with flanges in fluidic communication

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9991571
SERIAL NO

14834977

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery module (10) has a first and second partial modules (12, 16) with first and second battery cells (14, 18) respectively. A cooling medium for cooling the first battery cells (14) is in a first volume that is bounded by a first partial housing (28) and can flow through the first partial module (12), and a cooling medium for cooling the second battery cells (18) in a second volume bounded by a second partial housing (34) can flow through the second partial module (16). The first partial housing (28) has a first tubular flange (36) projecting into a first intermediate space (24) between the first battery cells (14), and the second partial housing (34) has a second tubular flange (38) projecting into a second intermediate space (30) between the second battery cells (18). The first and second volumes are connected via the first and second tubular flanges (36, 38).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DR ING H C F PORSCHE AKTIENGESELLSCHAFTPORSCHEPLATZ 1 STUTTGART 70435

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grass, Dominik Bietigheim-Bissingen, DE 25 12
Mingers, Thierry Sospel, FR 7 37
Schmidt, Tim Ludwigsburg, DE 39 194

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00