Methods and devices associated with bonding of solid-state lithium batteries

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9991550
SERIAL NO

14691754

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An example device includes a lithium-based battery having conductive battery contacts protruding from a surface of the battery, where a non-conductive portion of the surface of the battery separates the conductive battery contacts. The battery is a type that undergoes an expansion during charging in which the expansion of the lithium-based battery includes an outward bulging of the non-conductive portion of the battery surface. The device includes a substrate having conductive substrate contacts. The conductive battery contacts are electrically connected to the respective conductive substrate contact via a flexible electrically-conductive adhesive that physically separates the conductive battery contacts from the respective conductive substrate contacts and allows for relative movement therebetween caused by the expansion of the lithium-based battery.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOOGLE LLC1600 AMPHITHEATRE PARKWAY MOUNTAIN VIEW CA 94043

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Etzkorn, James Mountain View, US 65 1025
Pepin, Brian Marc Oakland, US 22 52
Phung, Dat San Jose, US 2 6
Pisheh, Hojr Sedaghat Rohnert Park, US 7 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00