Nonvolatile memory device and a method of operating the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9991007
APP PUB NO 20170125128A1
SERIAL NO

15207774

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nonvolatile memory device with a memory cell array including a plurality of memory cells coupled to first through M-th wordlines and first through N-th bitlines (M>2, N>2), and a page buffer circuit including first through N-th page buffers that are coupled to the first through N-th bitlines, respectively, and generate first through N-th output data, respectively. A K-th page buffer includes first through L-th latches which generate read data by sampling a voltage of a K-th output line, which is discharged through a K-th bitline, at different sampling timings after a read voltage is applied to a P-th wordline (K≤N, L>1, P≤M). The K-th page buffer outputs the first output data if an error in the read data of the first latch is correctable.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAMSUNG ELECTRONICS CO LTDSUWON-CITY KYUNGKI-DO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Ji-Sang Iksan-Si, KR 48 578
Park, Sang-Soo Hwaseong-Si, KR 40 488
Shim, Dong-Kyo Seoul, KR 11 94

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00