Storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9990965
APP PUB NO 20130155790A1
SERIAL NO

13709196

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Noise attributed to signals of a word line, in first and second bit lines which are overlapped with the same word line in memory cells stacked in a three-dimensional manner is reduced in a storage device with a folded bit-line architecture. The storage device includes a driver circuit including a sense amplifier, and first and second memory cell arrays which are stacked each other. The first memory cell array includes a first memory cell electrically connected to the first bit line and a first word line, and the second memory cell array includes a second memory cell electrically connected to the second bit line and a second word line. The first and second bit lines are electrically connected to the sense amplifier in the folded bit-line architecture. The first word line, first bit line, second bit line, and second word line are disposed in this manner over the driver circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEMICONDUCTOR ENERGY LABORATORY CO LTDATSUGI-SHI KANAGAWA-KEN 243-0036

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Atsumi, Tomoaki Kanagawa, JP 139 2041

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00