System for predicting amount of production and method for predicting amount of production

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9990588
APP PUB NO 20160273314A1
SERIAL NO

14662320

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a production amount prediction system including: a storage unit which stores a production amount prediction model which is based on resources information including a resources amount obtained in a previously drilled wellbore and a resources recovery probability in the vicinity thereof; an input unit which receives a trajectory coordinate of a planned wellbore as an input; a production amount prediction unit which calculates a production amount of the planned wellbore based on the production amount prediction model by using a degree of influence of the previous wellbore on the planned wellbore as at least one parameter; and a display unit which displays the production amount of resources of the planned wellbore calculated by the production amount prediction unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dayal, Umeshwar Santa Clara, US 160 4381
Peng, Shouchun Tokyo, JP 6 4
Sahu, Anshuman Santa Clara, US 7 43
Tanuma, Iwao Tokyo, JP 5 16
Vennelakanti, Ravigopal Santa Clara, US 44 555
Yamasaki, Masami Tokyo, JP 17 238
Yoshikawa, Hiroshi Tokyo, JP 160 1646

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00