Fault analysis in electric networks having a plurality of multi-phase buses

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9989580
APP PUB NO 20140052391A1
SERIAL NO

13946644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Fault analysis for an electric network having a plurality of multi-phase buses is performed by computing equivalent circuits for the multi-phase buses of interest. Each equivalent circuit includes an N×N impedance matrix, N corresponding to the number of phases of the multi-phase bus for which that equivalent circuit is computed. Elements of the impedance matrices are determined based on voltages resulting from a plurality of experimental current injection vectors and a factorized pre-fault admittance matrix. The pre-fault admittance matrix represents nodal admittance of the multi-phase buses without faults. A fault current injection vector for each multi-phase bus and fault type of interest is determined based on the equivalent circuit determined for that multi-phase bus. A fault voltage vector for each multi-phase bus and fault type of interest is determined based on the factorized pre-fault admittance matrix and the fault current injection vector determined for that multi-phase bus and fault type.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI ENERGY LTD8050 ZÜRICH

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Feng, Xiaoming Cary, US 43 196
Krueppel, Christian Cologne, DE 1 7
Peterson, William Fulshear, US 45 903

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00